Scope of Work

Asher Holmes Elementary School:
  • Replace heating, ventilation, and air conditioning systems throughout the school (including classrooms) to be energy efficient
  • Replace single-paned exterior windows
  • Replace boiler, pumps, and expansion tank
  • Replace main electrical distribution panel, panel boards, and feeders
  • Replace fire alarm system
  • Replace automatic temperature control main panel
Estimated Cost: $4.90 million
State Share: $1.960 million

Frank Defino Central Elementary School:
  • Replace heating, ventilation, and air conditioning systems throughout the school (including classrooms) to be energy efficient
  • Replace single-paned exterior windows
  • Replace boiler, pumps, and expansion tank
  • Replace electrical panel boards and feeders
  • Replace fire alarm system
  • Replace water heater
  • Replace automatic temperature control main panel
Estimated Cost: $3.93 million
State Share: $1.572 million

Frank J. Dugan Elementary School:
  • Replace heating, ventilation, and air conditioning systems throughout the school (including classrooms) to be energy efficient
  • Replace fire alarm system
  • Replace automatic temperature control main panel
Estimated Cost: $2.61 million
State Share: $1.044 million

Marlboro Elementary School:
  • Replace heating, ventilation, and air conditioning systems throughout the school (including classrooms) to be energy efficient
  • Replace single-paned exterior windows
  • Replace boilers, pumps, and expansion tank
  • Replace electrical panel boards and feeders
  • Replace fire alarm system
  • Replace water heater
  • Replace automatic temperature control main panel
Estimated Cost: $4.73 million
State Share: $1.892 million

Marlboro Middle School:
  • Replace heating, ventilation, and air conditioning systems throughout the school (including classrooms) to be energy efficient
  • Replace single-paned exterior windows
  • Replace boilers, pumps, and expansion tank
  • Replace electrical panel boards and feeders
  • Replace fire alarm system
  • Replace water heater
  • Replace emergency generator
  • Replace automatic temperature control main panel
Estimated Cost: $6.16 million
State Share: $2.464 million

Robertsville Elementary School:
  • Replace heating, ventilation, and air conditioning systems throughout the school (including classrooms) to be energy efficient
  • Replace single-paned exterior windows
  • Replace boiler, pumps, and expansion tank
  • Replace electrical panel boards, feeders, and main switchboard
  • Replace fire alarm system
  • Replace water heater
  • Replace automatic temperature control main panel
Estimated Cost: $3.97 million
State Share: $1.588 million