Asher Holmes Elementary School: - Replace heating, ventilation, and air conditioning systems throughout the school (including classrooms) to be energy efficient
- Replace single-paned exterior windows
- Replace boiler, pumps, and expansion tank
- Replace main electrical distribution panel, panel boards, and feeders
- Replace fire alarm system
- Replace automatic temperature control main panel
Estimated Cost: $4.90 million State Share: $1.960 million
Frank Defino Central Elementary School: - Replace heating, ventilation, and air conditioning systems throughout the school (including classrooms) to be energy efficient
- Replace single-paned exterior windows
- Replace boiler, pumps, and expansion tank
- Replace electrical panel boards and feeders
- Replace fire alarm system
- Replace water heater
- Replace automatic temperature control main panel
Estimated Cost: $3.93 million State Share: $1.572 million
Frank J. Dugan Elementary School: - Replace heating, ventilation, and air conditioning systems throughout the school (including classrooms) to be energy efficient
- Replace fire alarm system
- Replace automatic temperature control main panel
Estimated Cost: $2.61 million State Share: $1.044 million
Marlboro Elementary School: - Replace heating, ventilation, and air conditioning systems throughout the school (including classrooms) to be energy efficient
- Replace single-paned exterior windows
- Replace boilers, pumps, and expansion tank
- Replace electrical panel boards and feeders
- Replace fire alarm system
- Replace water heater
- Replace automatic temperature control main panel
Estimated Cost: $4.73 million State Share: $1.892 million
Marlboro Middle School: - Replace heating, ventilation, and air conditioning systems throughout the school (including classrooms) to be energy efficient
- Replace single-paned exterior windows
- Replace boilers, pumps, and expansion tank
- Replace electrical panel boards and feeders
- Replace fire alarm system
- Replace water heater
- Replace emergency generator
- Replace automatic temperature control main panel
Estimated Cost: $6.16 million State Share: $2.464 million
Robertsville Elementary School: - Replace heating, ventilation, and air conditioning systems throughout the school (including classrooms) to be energy efficient
- Replace single-paned exterior windows
- Replace boiler, pumps, and expansion tank
- Replace electrical panel boards, feeders, and main switchboard
- Replace fire alarm system
- Replace water heater
- Replace automatic temperature control main panel
Estimated Cost: $3.97 million State Share: $1.588 million
|
|